China Precast building sleeve connection sleeve grouting material splicing building sleeve concrete - China Supplier
China Precast building sleeve connection sleeve grouting material splicing building sleeve concrete - China Supplier China Precast building sleeve connection sleeve grouting material splicing building sleeve concrete - China Supplier China Precast building sleeve connection sleeve grouting material splicing building sleeve concrete - China Supplier China Precast building sleeve connection sleeve grouting material splicing building sleeve concrete - China Supplier

Precast building sleeve connection sleeve grouting material splicing building sleeve concrete

Price:元3 /米
Industry Category: Construction-Real-Estate
Product Category:
Brand: 中大恒建
Spec: 25


Contact Info

Other Products

Description
Additional Information

Sleeve grout for rebar connection is a cement-based dry-mix material preblended from cement, fine aggregates, and various concrete admixtures. When mixed with water on-site according to requirements, it forms a self-flowing slurry with advantages such as low viscosity, excellent fluidity, high strength, and micro-expansion without shrinkage. It is suitable for connecting prefabricated components in industrialized and prefabricated housing, and can also be used for secondary grouting of large equipment foundations and grouting of steel structure column bases.

I. Product Features

Excellent Fluidity: Initial flowability can reach 340mm, up to 380mm;
Good Workability: No sedimentation or bleeding even with excessive water addition, ensuring material homogeneity and workability;
Plastic Expansion: Begins expanding immediately after mixing with water, compensating for plastic shrinkage caused by water evaporation;
Late Expansion: Expands under confined conditions after hardening, ensuring a firm connection between rebar and sleeve;
Early Strength and High Strength: 3-day strength meets the 28-day requirements of ordinary grout, with final strength exceeding 100MPa;
Green and Eco-Friendly: Non-toxic, odorless, non-flammable, and harmless to the environment and operators; 

II. Technical Indicators

Technical Indicators

Standard Requirements

Test Results

Flowability/mm

Initial

≥300

340

30min

≥260

280

Compressive Strength/MPa

1d

≥35

40

3d

≥60

70

28d

≥85

100

Vertical Expansion Rate/%

3h

≥0.02

0.05

Difference between 24h and 3h

0.02~0.5

0.04

Chloride Ion Content/%

≤0.03

0.01

Bleeding Rate/%

0

0

*Complies with standard JG/T408-2013 "Sleeve Grout for Rebar Connection";
*Test results in the above table are for reference only and are not the basis for acceptance of each batch of material;

III. Scope of Application

1. Connection of prefabricated frame columns, shear walls, etc., to foundations in prefabricated and industrialized housing;
2. Secondary grouting of large equipment foundations; secondary grouting of high-rise steel structure column bases;
3. Other applications requiring high strength and good fluidity of grouting materials; 

IV. Usage Method

1. Base treatment: Clean the construction surface, remove loose dust, oil stains, etc., from the foundation surface; perform manual or mechanical scabbling (or apply interface agent). All construction surfaces must be solid and free of standing water;

2. Check whether the grouting holes and vent holes of the steel sleeve are blocked. If blocked, clear them in advance;

3. Connect the grouting pipe and prepare the plug;

4. Mix the grout with water according to the recommended water dosage. It is recommended to use a low-speed forced mixer, generally stirring for about 3 minutes. If using a hand drill for mixing, there will be more bubbles after mixing. Let it sit for about 2 minutes until the bubbles break before grouting;

5. If using manual mixing, the viscosity of the grout will be high initially. In this case, extend the mixing time instead of adding more water due to the high viscosity. With the recommended water dosage, the fluidity of the grout will improve as mixing time increases.

6. Perform manual or mechanical grouting, pouring from one end until it flows out from the other end, then seal the grouting hole and vent hole.

7. Do not disturb the grouted area within 24 hours after grouting.

Industry Category Construction-Real-Estate
Product Category
Brand: 中大恒建
Spec: 25
Stock: 434342
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192